Biomass Power Plants

  • Project
    A & U Greenfield BIOMASS Power Plant
  • Country
    Wielsbecke/Belgium
  • Amount
    2,200 Tons
  • • Design of 2.200 tons Boiler Supporting Structure and Turbine House Steel Structure including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 1.900 tons of painted steel structure including, NDT Testing, WPS, PQR, transportation, custom clearance and on-site handling.
  • • Fabrication of 300 tons of galvanized steel structure (secondary supports, gratings, handrails, ladders, stairs, etc.) including transportation, custom clearance and on site unloading.
  • • Installation of 2.200 tons of galvanized and painted steel structure, secondary supports, gratings, handrails, ladders, stairs, etc. including on site handling, lifting arrangements (heavy lifting where necessary) and temporary acceptance.
Biomass Power Plants

  • Project
    BIOMASS POWER PLANT
  • Country
  • Amount
    1750 Tons
  • • Design of 1.750 tons Boiler Supporting Structure and Turbine House Steel Structure including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 1.750 tons of galvanized steel structure including, NDT Testing, WPS, PQR, transportation, custom clearance and on-site handling.
  • • Installation of 1.750 tons of galvanized steel structure, secondary supports, gratings, handrails, ladders, stairs, etc. including on site handling, lifting arrangements (heavy lifting where necessary) and temporary acceptance.
Biomass Power Plants

  • Project
    KRONOSPAN II CHP
  • Contry
    Sanem/Luxembourg
  • Amount
    2.500 tons
  • Design of 2.500 tons Boiler Supporting Structure and Turbine House Steel Structure including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 2.500 tons of galvanized steel structure including, NDT Testing, WPS, PQR, transportation, custom clearance and on-site handling.
  • • Installation of 2.500 tons of galvanized steel structure, secondary supports, gratings, handrails, ladders, stairs, etc. including on site handling, lifting arrangements (heavy lifting where necessary) and temporary acceptance.
Biomass Power Plants

  • Project
    INEOS WATER TUBE BOILER
  • Contry
    Belgium
  • Amount
    200 Tons
  • • Design of 200 tons Boiler Supporting Structure including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 200 tons of painted steel structure including, NDT Testing, WPS, PQR, transportation, custom clearance and on-site handling.

Introductory Video