Tubular Air Preheater (TAPH)

  • Project
    Sodegaura Biomass CFB
  • Country
    Japan
  • Amount
    406 Tons
  • • Design of 406 tons Tubular Air Preheater including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 406 tons of Tubular Air Preheater including, NDT Testing, WPS, PQR, oversize transportation and custom clearance
Tubular Air Preheater (TAPH)

  • Project
    Palu-3 Biomass CFB
  • Country
    Indonesia
  • Amount
    800 Tons
  • • Design of 800 tons Tubular Air Preheater including 3-D modelling, connection statics, assembly drawings and workshop drawings.
  • • Fabrication of 800 tons of Tubular Air Preheater including, NDT Testing, WPS, PQR, oversize transportation and custom clearance

Introductory Video