



Previous
Next
Tubular Air Preheater (TAPH)
-
Project
Sodegaura Biomass CFB -
Country
Japan -
Amount
406 Tons - • Design of 406 tons Tubular Air Preheater including 3-D modelling, connection statics, assembly drawings and workshop drawings.
- • Fabrication of 406 tons of Tubular Air Preheater including, NDT Testing, WPS, PQR, oversize transportation and custom clearance


Previous
Next
Tubular Air Preheater (TAPH)
-
Project
Palu-3 Biomass CFB -
Country
Indonesia -
Amount
800 Tons - • Design of 800 tons Tubular Air Preheater including 3-D modelling, connection statics, assembly drawings and workshop drawings.
- • Fabrication of 800 tons of Tubular Air Preheater including, NDT Testing, WPS, PQR, oversize transportation and custom clearance